BUILD SMARTER. WITHOUT SHUTTING DOWN.
Simulate the impact of capital projects on live operations before breaking ground.
The Challenge
New terminals, runway repaves, taxiway extensions — capital projects disrupt live operations for months or years. Airports plan around construction with guesswork and buffer time, not data. Large infrastructure projects exceed their original budget by an average of 28%, often due to unforeseen operational impacts discovered mid-construction. There's no way to test whether single-runway operations can handle peak demand during a repave, or how a phased terminal closure affects gate utilization — until it's too late.
How AutoVerse Solves It

Phased Construction Modeling
Model phased construction timelines alongside live operations in a digital replica. See exactly how each closure phase impacts traffic flow, gate availability, and ground vehicle routing.

Alternate Configuration Testing
Test alternate configurations before committing — can the remaining runway handle peak hour demand? Which taxiway detour creates the fewest bottlenecks?

Infrastructure Validation
Validate new infrastructure designs with simulated traffic. Pour concrete on a taxiway layout you've already tested with 10,000 simulated operations.
Expected Impact
Fewer operational surprises during construction
Know the impact of each closure phase before it happens.
Shorter project timelines through better sequencing
Optimize construction phases to minimize operational disruption.
Validated infrastructure designs before capital commitment
Test new layouts with realistic traffic before pouring concrete.